    14116: Bannister Creek Living Stream: Final Stage

    Earthworks will reduce the bank slope and include an erosion control structure to reduce water flow.
    Earthworks will reduce the bank slope and include an erosion control structure to reduce water flow.

    Bannister Creek is the main drainage channel from residential areas in Lynwood and Parkwood and the Canning Vale industrial estate and is a significant tributary of the Swan Canning Estuary. It lies within a reserve managed by the City of Canning and Water Corporation.

    This project aims to improve water quality and habitat for fauna in the creek by reducing sedimentation. Activities include earthworks to reduce bank slope, weed control, revegetation with local native species, and installation of a riffle and sediment pool.

    Investment: $ 40 000
    In-kind contribution: $ 156 795
    Delivery organisation: Bannister Creek Catchment Group
    Project duration: January 2015 - October 2016
    Location: Bannister Creek, Lynwood.